![]() ![]() Ocean disposal sites are precise geographic areas within which ocean disposal is permitted subject to specific conditions in individual MPRSA permits. The permitting process for ocean disposal of dredged material requires the identification and designation of a site where materials may be disposed. Ocean Disposal Sites for Dredged Material Permits and Federal Projects Involving Dredged Materials MPRSA permits and federal projects involving ocean dumping of dredged material are subject to EPA review and concurrence.Īccording to USACE regulations ( 33 CFR 325.6 (PDF)), MPRSA permits for, and federal projects involving, the transportation of dredged material for the purpose of dumping it into ocean waters may not exceed three years. USACE relies on EPA’s ocean dumping criteria when evaluating permit requests for (and implementing federal projects involving) the transportation of dredged material for the purpose of dumping it into ocean waters. In the case of federal navigation projects, USACE may implement the MPRSA directly in the USACE projects involving ocean disposal of dredged materials. Army Corps of Engineers (USACE) is the federal agency that decides whether to issue a permit authorizing the ocean disposal of dredged materials. Under section 103 of the Marine Protection, Research and Sanctuaries Act (MPRSA), the U.S. ![]() Permits and Federal Projects Involving Dredged Material Dredged material is sediment excavated or otherwise removed from the bottoms of the navigable waters of the United States to maintain navigation channels and docks. In the United States, uncontaminated dredged material is the primary material disposed into the ocean today. Additional information about ocean dumping permits.EPA may issue special permits, research permits, emergency permits and general permits for ocean dumping. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |